Wohnquartier am Westhafen in Frankfurt

Floors: 19 above ground
Height: 66.00 m
Completion: 12/2023
Status: under construction
Usage: residential

Wohnquartier am Westhafen Address

Gutleutstraße 299
City: Frankfurt
District: Gutleutviertel
Zone: West Harbor

Wohnquartier am Westhafen Rental

Phone: +49 69 173 269 391
Email: request via email

Involved Companies - Wohnquartier am Westhafen

Company Category
Cyrus Architekten architecture office
MA Architekten architecture office

In the West Harbor, a housing complex with two residential towers and a student residence named The Fizz II is being built on a plot of an industrial road of more than one hectare. The project is named ‘Living Quarter at Harbor West’ (Wohnquartier am Westhafen). The tallest of the two residential towers will be 66 meters high and have 19 floors. The smaller tower is to be 38 meters high. The design comes from Cyrus Moser Architekten.

The new residential quarter is embedded between Sommerhoffpark, river Main and railroad tracks, and is in close proximity to the Main. Those traveling on the Main-Neckar-Bridge in Frankfurt will be able to view this ensemble as they enter Frankfurt.

So far, the property is not developed for passers-by. The route along the Main river banks ends at the Main-Neckar-Bridge. However, pedestrians and cyclists will be able to stroll along the bridge by the river in the future. There will be a planned gap between the Mainuferpromenade and the Sommerhoffpark. According to the green space office, investors are building a 12-meter-wide green promenade, which will be handed over after completion to the City of Frankfurt.

Frankfurt Rent Flat - Find Apartment in Frankfurt with skyline view - rent or buy housing - Mainhattan apartments

Rent or Buy an Apartment in Frankfurt?
Are you looking for an apartment or house with a skyline view, cheap or upscale, small or large? We know the best offers to rent or buy.

Planning and Construction

Zech - Group -Sommerhoffpark - Westhafen - Cyrus -Moser
wohnquartier-am-westhafen-frankfurt-construction-site-march-2022

Status May 2021: The Artisa Group from Switzerland is the new owner and has taken over the project from International Campus. The construction work should continue soon. The new date for completion is planned for the end of 2023.

Status August 2020: The construction work on the building complex has been interrupted and are expected to be resumed soon.

Residential towers at Sommerhoffpark - Designed by cyrus moser architekten - construction site as of February 2020

Status September 2019: During a visit of the SKYLINE ATLAS at Cyrus Moser Architekten we found the model of “Wohnen am Sommerhoffpark”. Noteworthy are the dimensions of the dorm along the railway line. The building serves as a soundproofing for the high-rise residential buildings and hangs over to the Main river.

Status September 2019: The construction has been stopped several months ago. The following view of the site was photographed during a helicopter flight in September 2019.

Wohnquartier at Westhafen - Living Quarter at Harbor West Frankfurt - Highrise at Sommerhoffpark - Rental apartments and student dormitory - New building at the Main river shore - construction site in September 2019

Status October 2017: Construction work has just begun.

Wohnquartier am Sommerhoffpark - Hochhäuser Hochhaus Mainufer Frankfurt

Thus, the area for the residential quarter at the Westhafen in late summer 2016 is shown here in the picture below. Behind the passage, the residential quarter with new high-rise buildings are being built:

Baustelle Wohnquartier Westhafen im August 2016

Leave us a Comment