André Friedel

Home > Magazin > Interviews > André Friedel Fit for the Future: BIM Use in High-Rise Construction Architect André Friedel from Drees & Sommer in Conversation Complex high-rise buildings require perfect planning. BIM (Building Information Modeling) provides a remedy here and enables efficient and digitized collaboration between the various trades involved in construction. However, the

Main Triangel

Main Triangle is an office building directly opposite the ECB in Frankfurt-Sachsenhausen. The design planning was done by Fritz Novotny. The complex, consisting of two building parts, was completed in 2008. Particularly striking is the atrium roof made of glass and steel, which spans the freely accessible inner courtyard. The Bilfinger construction company was responsible for

The Docks

The Docks is an ensemble of buildings designed by Meixner Schlüter Wendt in the East Port of Frankfurt am Main and was inspired by the overseas containers in the cargo port opposite. It is located not far from Hanauer Landstraße and within walking distance of the European Central Bank and Hafenpark Quartier. The project developer

Ed. Züblin AG

Züblin is a construction company based in Stuttgart. It was founded in 1898 by the Swiss engineer Eduard Züblin and is now the number 1 in German building and civil engineering. It is a member of the globally active STRABAG SE. The company currently comprises around 14,000 employees and is characterized above all by intelligent

Skytower (ECB)

The headquarters of the European Central Bank (ECB) is located in Frankfurt's City East and consists of two elements: the former wholesale market hall (Großmarkthalle) from 1928 and a 185-meter-high double tower with a shared facade. The ECB skyscraper was built in the architectural style of deconstructivism: From a distance you have the feeling that