16

Jan

Completion of the Exhibition Center by 2025

The Sparda Bank Tower and the new Messeplatz entrance will be built on the trade fair grounds on Europa-Allee by 2025. The entrance is located at the future subway stop of the new U5 in the Europaviertel. This means that the trade fair center can be optimally reached by all guests from any direction in

What is and does an Architectural Office?

The main task of an architectural office is the design, technical and economic planning of buildings, e.g. sustainable high-rise buildings. The architectural laws of the federal states define the professional task, although these may differ in certain aspects. Likewise, certain specializations within general architecture differ. For example, it is possible to specialize in landscape architecture or